Inspected in, not inspected after.

Quality begins at the receiving dock and ends only when test reports and dispatch clearances are in hand. Here's how each checkpoint works.

Technician testing electrical equipment with a meter

Inspection framework

Eight checkpoints, one record.

Processes marked 'Documented' are described in Resonant Equipment's own workflow documentation. Others are standard stages pending confirmation of in-house practice.

  1. 01 Documented

    Incoming Material Inspection

    Every inbound material is checked by QA/QC against its purchase order before release. Rejections are raised with vendors through Non-Conformance Reports.

  2. 02To be confirmed

    Dimensional Inspection

    Laminations, coils and fabricated tanks are measured against drawings at the stage they are made.

  3. 03To be confirmed

    Winding Inspection

    Windings are checked for conductor, turns, insulation placement and dimensions before assembly.

  4. 04To be confirmed

    Insulation Inspection

    Insulation components, spacers and clearances are inspected before the active part is closed.

  5. 05 Documented

    Electrical Testing

    Finished transformers are tested and results are captured in technical test reports reviewed by the testing function.

  6. 06To be confirmed

    Routine Testing

    Routine tests per the applicable standard and customer specification. The in-house test list is to be confirmed.

  7. 07 Documented

    Final Inspection

    Test reports and, where applicable, customer dispatch clearance (MDCC) must be in hand before a vehicle is booked.

  8. 08 Documented

    Documentation & Traceability

    Purchase orders trace to the design BOM in ERP; NCRs, test reports and dispatch papers are filed for every unit.

Routine test programme

Typical routine tests for oil-immersed transformers are listed as a checklist. The in-house test list, laboratory equipment and governing standards will be published once confirmed.

Test list to be confirmed
Electrical control panel with modules and wiring
  • T01Winding resistance measurement
  • T02Voltage ratio and polarity / vector group
  • T03Insulation resistance
  • T04No-load loss and current
  • T05Load loss and impedance voltage
  • T06Separate-source and induced over-voltage withstand

Quality management certifications

To be confirmed

Testing laboratory details & equipment list

To be confirmed

Applicable national / international standards

To be confirmed