Inspected in,
Quality begins at the receiving dock and ends only when test reports and dispatch clearances are in hand. Here's how each checkpoint works.

Inspection framework
Eight checkpoints,
Processes marked 'Documented' are described in Resonant Equipment's own workflow documentation. Others are standard stages pending confirmation of in-house practice.
- 01 Documented
Incoming Material Inspection
Every inbound material is checked by QA/QC against its purchase order before release. Rejections are raised with vendors through Non-Conformance Reports.
- 02To be confirmed
Dimensional Inspection
Laminations, coils and fabricated tanks are measured against drawings at the stage they are made.
- 03To be confirmed
Winding Inspection
Windings are checked for conductor, turns, insulation placement and dimensions before assembly.
- 04To be confirmed
Insulation Inspection
Insulation components, spacers and clearances are inspected before the active part is closed.
- 05 Documented
Electrical Testing
Finished transformers are tested and results are captured in technical test reports reviewed by the testing function.
- 06To be confirmed
Routine Testing
Routine tests per the applicable standard and customer specification. The in-house test list is to be confirmed.
- 07 Documented
Final Inspection
Test reports and, where applicable, customer dispatch clearance (MDCC) must be in hand before a vehicle is booked.
- 08 Documented
Documentation & Traceability
Purchase orders trace to the design BOM in ERP; NCRs, test reports and dispatch papers are filed for every unit.
Routine test programme
Typical routine tests for oil-immersed transformers are listed as a checklist. The in-house test list, laboratory equipment and governing standards will be published once confirmed.
Test list to be confirmed
- T01Winding resistance measurement
- T02Voltage ratio and polarity / vector group
- T03Insulation resistance
- T04No-load loss and current
- T05Load loss and impedance voltage
- T06Separate-source and induced over-voltage withstand
Quality management certifications
To be confirmedTesting laboratory details & equipment list
To be confirmedApplicable national / international standards
To be confirmed